3R Energy Logo

Lanark Auction Market, Hyndford Road
Lanark, ML11 9AX


01555 660244
info@3renergy.co.uk

Mollance Farm

mollance1.jpg

3R Energy completed the full turnkey service for our customers at Mollance by undertaking initial feasibility study, system design, boiler supply and installation of their new 150kW HSK Heizomat boiler. The project at Mollance is a great example how a biomass system can be designed to provide heat and hot water for a number of homes that are in close proximity, reducing heating costs and generating income at the same time. 

Our customers, Mr and Mrs Cartner, also built a very innovative store for their woodchip using indigenous stone to match the existing house. Craig Drummond, 3R Energy’s Biomass Installations Director, is pleased with the installation and said: “The Mollance projectis a tremendous example of how biomass can be used to heat your property, even when restricted by plant room space. Heizomat’s ability to operate efficiently with no need for buffer vessels allows for compact installs with maximum output."

Client: Mr and Mrs Cartner
Project Location: Mollance, Castle Douglas, Dumfries
Project Facts: 150kW HSK Heizomat Boiler